사용자 환경을 개선하기 위해 이 웹 사이트의 쿠키 및 기타 기술을 사용합니다.
이 페이지의 링크를 클릭하면 당사의 개인 정보 보호 정책쿠키 정책에 동의하는 것입니다.
동의함 더 알아보기
TENtec 아이콘

1.2013.11.11 by European Union


Mar 18, 2014

TENtec 정보

Shop Google Play on the web. Purchase and enjoy instantly on your Android phone or tablet without the hassle of syncing.

TENtec for Android provides a comprehensive overview on the European Commission's work in relation to the Trans-European Transport Network (TEN-T) and aims to raise citizens' awareness of the benefits of the TEN-T policy development.#

The new EU infrastructure policy establishes, for the first time, a core transport network built on nine major corridors: 2 North–South corridors, 3 East–West corridors; and 4 diagonal corridors. The core network will transform East–West connections, remove bottlenecks, upgrade infrastructure and streamline cross-border transport operations for passengers and businesses throughout the EU. It will improve connections between different modes of transport and contribute to the EU's climate change objectives. The core network is to be completed by 2030. The availability of funding will depend on the successful conclusion of negotiations on the overall MFF 2014-2020.

The new core transport network will be supported by a comprehensive network of routes, feeding into the core network at regional and national level. The comprehensive network, will ensure full coverage of the EU and accessibility of all regions. The aim is to ensure that progressively, and by 2050, the great majority of Europe's citizens and businesses will be no more than 30 minutes' travel time from this comprehensive network.

Taken as a whole, the new transport network will deliver:

1. safer and less congested travel

2. smoother and quicker journeys.

The €26 billion (current prices) allocated to transport under the Connecting Europe Facility (CEF) of the MFF (multi-annual financial framework) will effectively act as "seed capital" to stimulate further investment by Member States to complete difficult cross-border connections and links which might not otherwise get built. It is estimated that the cost of implementing the first financing phase for the core network for 2014–2020 (see attached list of projects) will cost €250 billion. The core network is to be completed by 2030.

The new core network – the figures

The core network will connect:

1. 94 main European ports with rail and road links

2. 38 key airports with rail connections into major cities

3. 15,000 km of railway line upgraded to high speed

4. 35 cross-border projects to reduce bottlenecks

Features:

- Use interactive maps zoom, pan and overlay different TEN-T layers

- shows TEN-T comprehensive and core network for roads, railways, inland-waterways, ports airports, rail-road terminals. Filter by one or more countries

- shows TEN-T core network corridors

- shows TEN-T projects (unified mapping)

- innovation on TEN-T

최신 버전 1.2013.11.11의 새로운 기능

Last updated on Mar 18, 2014

Minor bug fixes and improvements. Install or update to the newest version to check it out!

번역 로드 중...

추가 앱 정보

최신 버전

TENtec 업데이트 요청 1.2013.11.11

필요한 Android 버전

4.0 and up

더 보기

TENtec 스크린 샷

APKPure를 구독하십시오
최고의 Android 게임 및 앱의 초기 릴리스, 뉴스 및 가이드에 액세스하는 첫 번째 사람이 되십시오.
고맙지 만 사양 할게
가입하기
성공적으로 구독!
당신은 이제 APKPure에 가입되었습니다.
APKPure를 구독하십시오
최고의 Android 게임 및 앱의 초기 릴리스, 뉴스 및 가이드에 액세스하는 첫 번째 사람이 되십시오.
고맙지 만 사양 할게
가입하기
성공!
당신은 이제 우리의 뉴스 레터를 구독하고 있습니다.